How to list a project when its live demo is no longer running

Present completed work accurately without sending a reviewer to a broken or misleading link.

  • Updated
  • Reading time3 min (623 words)
  • Share

By Relwick · Published

Student hosting expires, test environments are removed, and old APIs stop supporting a demonstration. None of those events automatically erase the work, but a resume should not imply that an unavailable service is operating today.

The goal is to give a reader usable evidence and an accurate timeline. Rebuilding a demo is one option; it is not the only honest way to present completed work.

Quick answer & key takeaways

Keep the project if its work is relevant, but label its current status accurately and remove or replace a broken live-demo link. Use an accessible repository, documented case study, or permitted demonstration recording to show what existed. Distinguish historical implementation from a service that is currently maintained, and test every replacement link from a visitor’s perspective.

  • State whether the project is archived, completed, or actively maintained.
  • Replace a broken link with evidence that a reviewer can actually access.
  • Do not present an old recording as proof of current availability.

Make the status explicit

A title such as “Course scheduling prototype — completed May 2025” gives clearer context than “Live scheduling platform” when no service is running. Keep past-tense implementation claims separate from present-tense operational claims. If the repository remains available but the hosted demonstration has ended, say that in the linked project description.

Avoid calling a project production-ready merely because it once had a public URL. A demonstration deployment and an operated service are different experiences. Describe whichever one you actually completed.

Choose a useful replacement for the live link

EvidenceWhat to explain alongside it
Public repositorySetup instructions, scope, and known limitations.
Case-study pageProblem, your contribution, and what was actually implemented.
Recorded demonstrationRecording date and the version being shown.
ScreenshotsWhat each image demonstrates and what it cannot prove.

Use only material you are allowed to share. A repository link is not a reason to publish an employer’s code or private data. If public evidence is unavailable, a concise truthful description can be preferable to an inaccessible link that suggests more than a reader can inspect.

Test the evidence without your own access privileges

Open the destination while signed out or in a separate browser context. Check whether it displays the intended content, asks for an account, or returns an error. GitHub distinguishes public repositories from private repositories with restricted access; your ability to open your own repository does not establish that a recruiter can open it.

If a recording or document requires permission, either provide an appropriate accessible alternative or state the access arrangement clearly. Avoid a chain of redirects or several unexplained folders when one useful project page can orient the reader.

Update the text and link together

In Resume Studio, change both the visible label and destination. A label saying “Live demo” should not point to an archive without explanation. Export a fresh PDF and click the link in that file, because fixing the draft does not update a PDF you already downloaded.

Keep the project’s results tied to their historical setting. If a benchmark was run on the old version, identify it as such in the supporting material rather than implying it measures the current code.

Frequently asked questions

Must I remove every project without a live website?

No. Relevance and evidence matter more than the presence of a continuously running demo. Describe the status honestly.

Can screenshots replace all technical evidence?

Screenshots show appearance at a moment in time. They do not by themselves demonstrate implementation details or current functionality.

What if I plan to restart the demo soon?

Describe the current state. Update the resume and evidence once the new deployment is available and checked.

Sources and further reading

Summary

A completed project can remain useful evidence after hosting ends. Give it an accurate status and a working route to whatever evidence you can legitimately share.

Related guides

Browse all guides →